Recent Planning Applications

14 Davis Crescent Pirton Hitchin Hertfordshire SG5 3RB

26th May 2026

4x Conifer - Remove

26 Royal Oak Lane Pirton Hertfordshire SG5 3QT

20th May 2026

Multi-stemmed Ash - Remove the remaining section on safety grounds.

Land On The West Side Of Burge End Lane Pirton Hertfordshire SG5 3QN

12th May 2026

Erection of one two-bedroom dwelling including landscaping, bin and bike storage and installation of air source heat pump, solar cells and EV charging point. Alterations to existing vehicular access to accommodate two parking spaces.

Burge End Farmhouse 4 Burge End Lane Pirton Hertfordshire SG5 3QN

29th April 2026

Installation of solar panels to the south east roofslope of existing detached garage

20 Cromwell Way Pirton Hitchin Hertfordshire SG5 3RD

28th April 2026

Single storey rear extension.

2 West Lane Pirton Hitchin Hertfordshire SG5 3RA

24th April 2026

T1: Norway Maple - Pollard approx 6m in height.

West Lane Farm West Lane Pirton Hertfordshire SG5 3QP

22nd April 2026

Change of use from Cart Lodge to car storage (garage) for personal use in association with Prairie Barn including installation of roller-shutter doors and insertion of side door.

Burge End Farmhouse 4 Burge End Lane Pirton Hertfordshire SG5 3QN

10th April 2026

Replace existing timber 6-panel rear door with timber 5-panel door

21 Shillington Road Pirton Hitchin Hertfordshire SG5 3QJ

8th April 2026

Apple - Prune the central leader from the trunk and leave it level with the other branches. Remove any suckers or limbs that begin to grow below the level of the main branches, lower height where pollarding is appropriate.

4 Royal Oak Lane Pirton Hitchin Hertfordshire SG5 3QT

27th March 2026

Cherry, Hawthorn - Up to a 1m reduction

Crofts House 1 St Marys Close Pirton Hitchin Hertfordshire SG5 3RG

10th March 2026

T1: Maple - Fell to ground level

Holly Court 6 High Street Pirton Hitchin Hertfordshire SG5 3PS

4th March 2026

T1 : Apple tree - Removal. T2 : Conifer tree - Removal

2 Crab Tree Lane Pirton Hitchin Hertfordshire SG5 3QE

25th February 2026

Remove existing render. Prior to applying a 3-coat lime rendering onto wooden laths, install breathable insulation into any available voids between frame members. Replace guttering in association with installation of a perimeter French drain around the bui

32 Shillington Road Pirton Hitchin Hertfordshire SG5 3QL

30th January 2026

Installation of a log burner in main reception room.

Springfields Bury End Pirton Hitchin Hertfordshire SG5 3QB

17th December 2025

T1: Sycamore - Remove

Motte And Bailey 1 Great Green Pirton Hitchin Hertfordshire SG5 3QD

27th November 2025

Erection of one 4-bedroom detached dwelling including bin store, parking, landscaping and reconfiguration of the existing public house car park and rear garden. Creation of vehicular access off Crab Tree Lane.

Land At Davis Crescent Pirton Hertfordshire SG5 3RB

25th November 2025

T1: Cherry - Remove to ground level. T7: Lime - Crown reduce to previous points. T4: Cherry, T3 Lime - Crown lift to height clearance 2.5m from ground level. T3: Lime - Crown lift to height over path 2.5m, 5.2m over road.

2 Hambridge Way Pirton Hitchin Hertfordshire SG5 3QS

12th November 2025

T1: Willow - Reduce height by approx 3m and lateral spread by approx 4m. T2: Pear - Remove weight (removing any dead branches) and reduce height by approx 3 to 4m and lateral spread by approx 3m

19 Cromwell Way Pirton Hitchin Hertfordshire SG5 3RD

4th November 2025

Two storey side extension and single storey rear extension. Erection of front porch following demolition of existing side porch.

1 Burge End Lane Pirton Hitchin Hertfordshire SG5 3QN

20th October 2025

T2: Apple - Crown reduction to previous pruning points. T2: Holly - Reduce in height by 50% and prune all round to shape. T3: Amelanchier - Crown reduction to previous pruning points. T4: Crab Apple - Crown reduction by 30% and reshape. T5: Rowan - Crown r

7 Hitchin Road Pirton Hertfordshire SG5 3PZ

20th October 2025

Erection of detached outbuilding to include solar panels on roof for use as studio, garden store and workshop following demolition of existing detached outbuildings.

The Lodge Shillington Road Pirton Hitchin Hertfordshire SG5 3HB

16th October 2025

Altered footprint and siting; addition of rooflight in ensuite and window to ground floor shower room. (as Non-Material Amendment to planning permission 24/02341/FPH granted 12.12.2024)

1 Hambridge Way Pirton Hitchin Hertfordshire SG5 3QS

3rd October 2025

T1002: Mixed Cypress - Fell. T1008: Western Red Cedar - Fell to ground level.

11 Hitchin Road Pirton Hitchin Hertfordshire SG5 3PZ

3rd October 2025

Cherry - Side back up to 2m. Maple - Prune up to 1.5m. Honey Locus - Reduce extended limb up to 1m. Conifer, Forsythia and Smoke Bush - Trim removing new growth only.

Pirton School High Street Pirton Hertfordshire SG5 3PS

2nd October 2025

T1: Damson - Reduce branches back from the building to create a 2-3m clearance